Wednesday, April 22, 2020

More work on the garage. This time with Liz


We made some serious headway in the last couple of days. The wires have been pulled, the conduit has been buried and the boxes have been installed. We framed out the opening and de-installed the garage door. We put in a large glass door and there will be an additional window installed eventually.  

Today we installed the rest of the collar ties and the strapping for the drywall/recessed lighting. We ran all the wiring for the cans which will house LED lights.  We also ran the wiring to the back wall for the mini split (which will be in the back of the garage)

At this rate we should have a usable space in the next couple of weeks. 